WEBVTT

00:00.000 --> 00:06.217
Three-phase asynchronous motor: the 6 terminals and 2 annexes for the thermal probe

00:06.217 --> 00:13.721
I will perform the triangle coupling

00:13.721 --> 00:23.100
It is advisable to arrange the 3 tabs vertically (and screw them!)

00:23.100 --> 00:28.907
I will connect them star by placing the tabs horizontally on the opposite side to the power supply!

00:28.907 --> 00:47.306
In order not to lose the third barrette we double one of the 2!

00:47.306 --> 00:58.517
To check the coils, the motor insulation, it should uncouple, remove the strips!

00:58.517 --> 01:11.808
And of course to log the engine to protect!